An existing building built in the 70s. However, the building doesn’t maximize the currently allowed GFA or gross floor area for the plot. So to take advantage of the prime location that exists in the underutilized GFA, the goal is to study the possibility of another building volume that can give a better return of investment while also making it a landmark in the critical urban point.
An existing building built in the 70s. However, the building doesn’t maximize the currently allowed GFA or gross floor area for the plot. So to take advantage of the prime location that exists in the underutilized GFA, the goal is to study the possibility of another building volume that can give a better return of investment while also making it a landmark in the critical urban point.
Options for conceptual massing based on the floor areas
Conceptual rendered view for primary massing option and its section
Site plan of the project with appropriate graphic overrides and annotations
Zone 3 coordination models in workset display